Saturday, June 6, 2026
16.1 C
Lusaka

Batoka Power Project to create six thousand jobs

Batoka gorge hydro – electricity power station is scheduled to be constructed on this proposed site as can be seen in the picture above. The proposed site is situated in the Zambezi river 26 kilometres from Livingstone town. The project will be financed by both the Zambian Government and Zimbabwe.
Batoka gorge hydro – electricity power station is scheduled to be constructed on this proposed site as can be seen in the picture above. The proposed site is situated in the Zambezi river 26 kilometres from Livingstone town. The project will be financed by both the Zambian Government and Zimbabwe.

The African Development Bank (AfDB) says about six thousand jobs will be created once the construction of the Batoka Hydro Power Project between Zambia and Zimbabwe commences.

This came to light during a high-level meeting in Abidjan, Ivory Coast on accelerating Africa’s growth and development that has been convened by AfDB to scrutinize the progress which it has made in facilitating the development of the continent.

The meeting is also evaluating the results achieved in AfDB supported programmes while at the same time examining plans to accelerate and scale-up programmes.

This is according to a press statement made available to ZANIS by Ministry of Finance, Public Relations Manager, Chileshe Kandeta in Lusaka today.

Mr. Kandeta said Under its High Five Initiative , the AfDB has identified Zambia as one of the beneficiaries from the USD758 million and integrate Africa programme, the USD59 million feed Africa Programme, and the USD2.5 billion quality of life improvement programme.

He said the Integrate Africa Programme is targeted at supporting the construction of a railway link between Angola and Zambia.

Mr. Kandeta stated that once constructed, the link will enhance trade and create an alternative route for Zambia’s exports from North-Western and Copperbelt Provinces.

He noted that the Integrate Africa Programme is also targeted at enhancing the supply capacity of the Southern Africa Power Pool by not only facilitating and galvanizing support for the Batoka Gorge Hydro Project, but also facilitating the completion of the Zambia-Tanzania-Kenya Power Interconnector.

And Minister of Finance Margaret Mwanakatwe has called on the African Development Bank to increase the capacity of implementation agencies in member countries in order to improve their resource absorption capacity.

The minister cited Zambia’s 19% annual absorption capacity of AfDB resources as a scenario in need of redress.

“This is to make sure that access to the benefits of development for the intended recipients are not delayed,” she said.

Meanwhile, African Development Bank President, Akinwumi Adesina said there is need to mobilise more resources in order to achieve the development targets of the bank through the High Five Initiative.

Dr. Adesina also announced that the AfDB will this year be organizing the first ever Africa Investment Forum in order to increase the international community’s attention on Africa’s growth potential and help channel resources to the continent.

Loading read count...

7 COMMENTS

  1. Not a single date mentioned (not even which decade any of this will all theoretically happen)

  2. As others have said, in the absence of timescales, is this just soundbites?. This Project has been tabled off-on since 1993. Lets hope for the sake of the Country, this is a genuine start.

    Not sure whether this is a 1,600MW as initial feasibility study showed, or what.

    Whats the environmental impact? Will there be a mini Operation Noah similar to the big one back in the mid 50’s when Kariba Dam was built? There are more questions than answers.

  3. LT give us reports and not intentions!!!! News is when the jobs are actually in hand not plans please.

  4. yes 5000 jobs for zim, 1000 for Zambia and once built how many? then the tourism industry will die as the water will back up to the falls, then nothing to see and no tourism jobs.
    big environmental disaster

Comments are closed.

Hot this week

Govt. to distribute 1,930 phones for SCT in Lundazi

Government has purchased 1,930 cellular phones to be distributed...

ZATEX 2026 officially opens

President Hakainde Hichilema has reaffirmed tourism’s vital role in...

Govt disburses K2.7 million in grants to Lubansenshi

Government has disbursed over 2.7million kwacha grants to 69...

Approximately 808 children are born with clubfoot in Zambia every year

Hope Walks Zambia Programme Manager Loice Chipere has disclosed...

Topics

Govt. to distribute 1,930 phones for SCT in Lundazi

Government has purchased 1,930 cellular phones to be distributed...

ZATEX 2026 officially opens

President Hakainde Hichilema has reaffirmed tourism’s vital role in...

Govt disburses K2.7 million in grants to Lubansenshi

Government has disbursed over 2.7million kwacha grants to 69...

Approximately 808 children are born with clubfoot in Zambia every year

Hope Walks Zambia Programme Manager Loice Chipere has disclosed...

Acting Chief Nyamphande urges subjects to push on climate change fight

Acting Chief Nyamphande of the Nsenga people of Lusangazi...

Govt.committed to improving agriculture sector

Mungwi District Commissioner, Muma Musonda has reaffirmed government's commitment...

Govt. committed to delivering development to all communities

Government has reaffirmed its commitment to delivering development to...

Related Articles

Popular Categories

spot_img